Documentation
Back
  • Plans, limits and what a scan costs
  • What Citerva measures
    • Setting up your first project
  • Running scans and reading the evidence
  • How every number is calculated
  • Project settings, pausing and archiving
  • Workspaces, members and seats
  • Competitors and topics
  • Scheduling scans
  • Recommendations, and what they are not

Search docs

Find a documentation page or section by title, description or heading.

Project settings, pausing and archiving

Changing what a project measures after it exists, and the difference between pausing, archiving and deleting.

Everything you set when creating a project can be changed afterwards, on the project's Settings page.

What you can change

FieldWhat it affects
NameThe brand Citerva looks for in answers. Changing it changes what counts as a mention.
WebsiteYour primary domain. Sources on it are attributed to you.
Other domains you ownOne per line. Sources on these are yours too.
Alternate namesOld names, legal names, common abbreviations — each on its own line.
Category and descriptionWhat the generated prompts are about.

Changes apply to future scans and to anything recomputed from stored answers. They do not silently rewrite what a past scan reported, because a scan is a record of what happened on a day.

Adding an alternate name or an owned domain is the most common reason a past number was wrong in your favour — the model did name you, under a name Citerva had not been told about. If that has happened, the raw answers are still stored and the figures can be re-derived from them without asking any provider again. Ask us.

Pausing

Pausing stops a project spending anything.

  • No scheduled scan runs. The schedule stays where it is and picks up at its next slot after you resume — it does not fire a backlog of everything it missed.
  • No manual scan can be started. The Run scan button says why.
  • Nothing already measured changes. Every scan, answer and figure stays readable while paused.

A paused project still occupies a slot against your plan's project limit. That is deliberate: pausing says you are coming back to it. If you want the slot back, archive instead.

Pause is the right control when you want a project to stop costing you money for a while. To stop only the automation while still scanning by hand, pause the schedule on the Scans page instead.

Archiving

Archiving is the real off switch for a project.

An archived project:

  • frees a slot against your plan's project limit, so you can create another;
  • keeps everything — every scan, every raw answer, every metric stays exactly as it was;
  • disappears from your project list.

It is not a delete. Nothing is destroyed, and the measurement history remains intact. That is deliberate: a settings page should not be able to throw away months of measurement by accident.

Deleting

There is no delete button for a project, and that is on purpose. Deleting a project would cascade away every scan, answer and metric belonging to it — the one action in this product that cannot be undone and cannot be reconstructed, because the raw answers are the only record that a model ever said what it said.

If you genuinely need a project and its history removed, contact us and we will do it deliberately rather than through a button that sits next to "rename".